{"id":10720,"date":"2021-08-12T07:41:17","date_gmt":"2021-08-12T07:41:17","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=10720"},"modified":"2021-08-12T07:41:17","modified_gmt":"2021-08-12T07:41:17","slug":"kenya-t-d-williamson-completes-first-pipeline-inspection-of-the-mombasa-to-nairobi-refined-multi-product-transmission-pipeline","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-t-d-williamson-completes-first-pipeline-inspection-of-the-mombasa-to-nairobi-refined-multi-product-transmission-pipeline\/","title":{"rendered":"KENYA: T.D. Williamson Completes First Pipeline Inspection of the Mombasa to Nairobi Refined Multi-product Transmission Pipeline"},"content":{"rendered":"<p style=\"font-weight: 400;\">T.D. Williamson (TDW), the global pipeline solutions provider, completed its first in-line inspection (ILI) in Kenya using TDW multiple dataset (MDS) technology.<\/p>\n<p style=\"font-weight: 400;\">The MDS platform incorporates a variety of inspection technologies on a single platform. It is widely accepted as the most comprehensive system on the market to identify integrity threats through a single in-line inspection run.<\/p>\n<p style=\"font-weight: 400;\">TDW performed the inspection on a new, 20-inch diameter refined multi-product transmission pipeline that runs 450 km (279 mi) from Mombasa to Nairobi. The pipeline is owned and operated by the Kenya Pipeline Company (KPC). The goal of the operation was to provide a baseline measurement to determine any threats that may impact future integrity, including mechanical damage, illegal hot taps, selective seam weld corrosion and material property changes such as hard spots.<\/p>\n<p>Prior to the MDS inspection, TDW and its Egyptian Channel Partner Engineering Petroleum Services (EPS) cleaned the pipeline to avoid potential ILI tool performance issues that can degrade inspection data. They performed 12 cleaning and gauging runs on the 450 km (279 mi) of pipeline, totaling 3,600 km (2,237 mi) of cleaning.<\/p>\n<p style=\"font-weight: 400;\">TDW Project Manager Jamie Bull oversaw the cleaning, gauging and inspection operations. Each achieved 100% success.<\/p>\n<p style=\"font-weight: 400;\">According to TDW Sales Manager Mohamed Hesham, the inspection prepared the pipeline to meet demand for petroleum products in Kenya and the region for years to come.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>T.D. Williamson (TDW), the global pipeline solutions provider, completed its first in-line inspection (ILI) in Kenya using TDW multiple dataset (MDS) technology. The MDS platform incorporates a variety of inspection &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/kenya-t-d-williamson-completes-first-pipeline-inspection-of-the-mombasa-to-nairobi-refined-multi-product-transmission-pipeline\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":10721,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,7443,11],"tags":[9508,9509,1275,9511,9510,9507],"class_list":["post-10720","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-eastern-africa","category-top-news","tag-egyptian-channel-partner-engineering-petroleum-services","tag-in-line-inspection","tag-kenya-pipeline-company","tag-mombasa-to-nairobi-pipeline","tag-multiple-dataset-technology","tag-t-d-williamson","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/08\/TDW-MDS-Kenya.jpg?fit=800%2C520&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2MU","jetpack-related-posts":[{"id":6814,"url":"https:\/\/www.oilnewskenya.com\/index.php\/turner-townsend-kenya-merges-project-management-firm-mml\/","url_meta":{"origin":10720,"position":0},"title":"Turner &#038; Townsend Kenya merges with project management firm MML","author":"","date":"February 6, 2018","format":false,"excerpt":"Turner & Townsend has announced that its Kenya business is to merge with Nairobi-based project management firm Mentor Management Limited (MML) after Turner & Townsend acquired a majority stake in MML from leading growth markets investor \u2013 Actis. The new entity, MML Turner & Townsend, will operate across the real\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Turner-Townsend.jpg?fit=641%2C640&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Turner-Townsend.jpg?fit=641%2C640&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Turner-Townsend.jpg?fit=641%2C640&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":589,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenya-looking-for-500m-to-construct-new-pipeline\/","url_meta":{"origin":10720,"position":1},"title":"Kenya looking for $500m to construct new Pipeline","author":"Samuel Kamau Mbote","date":"February 25, 2014","format":false,"excerpt":"[twitter-follow screen_name='oilnewskenya'] Kenya is looking for \u00a0a financier of a $500 million loan to put up a new fuel pipeline from Mombasa to Nairobi to replace the current 14 inch pipeline. The project that is being put together by East African countries in the northern corridor namely Kenya, Uganda and\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":762,"url":"https:\/\/www.oilnewskenya.com\/index.php\/kenyan-government-plans-to-increase-petroleum-products-storage-capacity\/","url_meta":{"origin":10720,"position":2},"title":"Kenyan government plans to increase petroleum products storage capacity","author":"Samuel Kamau Mbote","date":"March 21, 2014","format":false,"excerpt":"Kenya hopes to increase its storage capacity of petroleum products by 22 percent in the next 3 years in anticipation of increasing demand and increased product from a new pipeline from Mombasa expected to be complete by 2016. The four tanks to be constructed by the Kenya Petroleum company (KPC)\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2014\/03\/terminals_vttikenya_image_2.jpg?fit=380%2C260&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":4458,"url":"https:\/\/www.oilnewskenya.com\/index.php\/tanzania-pipeline-route-not-a-done-deal-kenya\/","url_meta":{"origin":10720,"position":3},"title":"Tanzania Pipeline Route Not A Done Deal \u2013 Kenya","author":"","date":"March 10, 2016","format":false,"excerpt":"Days after Tanzania and Uganda are said to have agreed on a more southern route that would avoid Kenya\u2019s oil rich Lokichar basin the latter\u2019s finance and energy cabinet secretaries are putting a brave face saying it is not a done deal. According to finance CS Henry Rotich and Energy\u2026","rel":"","context":"In \"Albertine basin\"","block_context":{"text":"Albertine basin","link":"https:\/\/www.oilnewskenya.com\/index.php\/tag\/albertine-basin\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2015\/10\/Kenya-Uganda-pipeline-design-1.jpg?fit=900%2C610&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":4834,"url":"https:\/\/www.oilnewskenya.com\/index.php\/morendat-centre-of-excellence-to-provide-oil-gas-courses-to-meet-regions-skills-shortage\/","url_meta":{"origin":10720,"position":4},"title":"Morendat Centre Of Excellence To Provide Oil &#038; Gas Courses To Meet Region\u2019s Skills Shortage","author":"","date":"July 14, 2016","format":false,"excerpt":"The Kenya Pipeline Company\u2019s \u00a0(KPC) Morendat Centre of Excellence is set to provide technical courses in oil and gas as the country grapples with skills shortage ahead of the development phase. Morendat facility in Naivasha will initially offer six courses namely Oil Pipeline I&C Technician; Oil Pipeline Mechanical Technician; Oil\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Morendat-Training-and-Conference-Centre.jpg?fit=800%2C600&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Morendat-Training-and-Conference-Centre.jpg?fit=800%2C600&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Morendat-Training-and-Conference-Centre.jpg?fit=800%2C600&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2016\/07\/Morendat-Training-and-Conference-Centre.jpg?fit=800%2C600&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":1150,"url":"https:\/\/www.oilnewskenya.com\/index.php\/east-africas-oil-pipeline-consultant-bid-to-be-advertised-by-july\/","url_meta":{"origin":10720,"position":5},"title":"East Africa\u2019s oil pipeline consultant bid to be advertised by July","author":"Samuel Kamau Mbote","date":"June 5, 2014","format":false,"excerpt":"The Kenya, Uganda, South Sudan oil pipeline consultancy bid advertisement is expected \u00a0\u00a0to be out in the next two to three weeks according to Kenya\u2019s ministry of energy. The pipeline that will stretch from the Hoima refinery in Uganda through Northern Kenya to the Kenyan coast will seek a single\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=10720"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10720\/revisions"}],"predecessor-version":[{"id":10723,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10720\/revisions\/10723"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/10721"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=10720"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=10720"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=10720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}