{"id":10421,"date":"2021-06-10T09:19:16","date_gmt":"2021-06-10T09:19:16","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=10421"},"modified":"2021-06-10T09:19:16","modified_gmt":"2021-06-10T09:19:16","slug":"pgs-data-is-available-for-the-extended-gabon-12th-licensing-round","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/pgs-data-is-available-for-the-extended-gabon-12th-licensing-round\/","title":{"rendered":"PGS Data is Available for the Extended Gabon 12th Licensing Round"},"content":{"rendered":"<div class=\"mainIntro\">\n<div class=\"row\">\n<div class=\"col-sm-12\">\n<p>PGS screening datasets allow the evaluation of all 35 open blocks in the ongoing Gabon shallow and deepwater licensing round. Packages covering north and south areas include 2D and 3D seismic. Well data is also available, for assessment of prospectivity and plays.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"mainBody\">\n<p>Gabon&#8217;s Minister of Petroleum, Gas and Mining has announced the extended closing date for the Gabon 12th Shallow and Deep Water Licensing Round. The new closing date for the submission of tenders is 30 June 2021. The acreage on offer includes 12 shallow water and 23 deepwater blocks.<\/p>\n<p>An extension to the tender submission deadline provides an opportunity to integrate new data into evaluations of open blocks.<\/p>\n<h5>PGS Datasets Allow the Evaluation of Available Blocks<\/h5>\n<p>Screening datasets, such as the\u00a0Gabon MegaSurvey\u00a0are a cost-effective tool for regional evaluation over the 35 open blocks on offer. The Direction Generale des Hydrocarbures (DGH) and PGS now offer over 65 000 sq. km of 3D seismic and over 21 000 km of 2D seismic data offshore Gabon.<\/p>\n<p>Data is also available for 167 wells within the MegaSurvey area. Value-added composite logs, used in conjunction with the regional seismic dataset, will help the assessment of prospectivity and play evaluation.<\/p>\n<p>Through their ongoing collaboration, PGS and ION offer combined regional data packages incorporating PGS MegaSurvey and ION BasinSPAN data that cover both North and South Gabon areas. Each regional data package encompasses approximately 20 000 sq. km of 3D MegaSurvey with a minimum of 4500 km of 2D SPAN.<\/p>\n<figure class=\"image\"><\/figure>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>PGS screening datasets allow the evaluation of all 35 open blocks in the ongoing Gabon shallow and deepwater licensing round. Packages covering north and south areas include 2D and 3D &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/pgs-data-is-available-for-the-extended-gabon-12th-licensing-round\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7447,7442,11],"tags":[],"class_list":["post-10421","post","type-post","status-publish","format-standard","hentry","category-central-africa","category-countries","category-top-news","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2I5","jetpack-related-posts":[{"id":8305,"url":"https:\/\/www.oilnewskenya.com\/index.php\/gabon-new-pgs-seismic-and-well-data-for-extended-gabon-license-round\/","url_meta":{"origin":10421,"position":0},"title":"GABON: New PGS Seismic and Well Data for Extended Gabon License Round","author":"","date":"June 10, 2020","format":false,"excerpt":"A recent expansion of Gabon MegaSurvey coverage has significantly increased access to 3D seismic over the 35 open blocks on offer. The Direction Generale des Hydrocarbures (DGH) and PGS now offer over 65 000 sq. km of 3D seismic and over 21 000 km of 2D seismic data. An extension\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/gabon-megasurvey-license-round-v2.jpg?fit=860%2C484&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/gabon-megasurvey-license-round-v2.jpg?fit=860%2C484&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/gabon-megasurvey-license-round-v2.jpg?fit=860%2C484&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/06\/gabon-megasurvey-license-round-v2.jpg?fit=860%2C484&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":8667,"url":"https:\/\/www.oilnewskenya.com\/index.php\/pgs-data-covers-key-blocks-for-nigerias-2020-bid-round\/","url_meta":{"origin":10421,"position":1},"title":"PGS Data Covers Key Blocks for Nigeria\u2019s 2020 Bid Round","author":"","date":"July 24, 2020","format":false,"excerpt":"The Department of Petroleum Resources (DPR), on behalf of the Federal Government of Nigeria, recently launched its 2020 licensing round. A total of fifty-seven marginal fields are on offer, including a number in shallow-water terrains. The\u00a0PGS Nigeria MegaSurvey\u00a0complements offshore blocks of the 2020 Marginal Fields Bid Round, offering prospective block\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/nigeria-marginal-oil-fields-PGS.jpg?fit=860%2C608&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/nigeria-marginal-oil-fields-PGS.jpg?fit=860%2C608&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/nigeria-marginal-oil-fields-PGS.jpg?fit=860%2C608&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/07\/nigeria-marginal-oil-fields-PGS.jpg?fit=860%2C608&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13109,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-pgs-supports-nigeria-delta-mini-bid-round\/","url_meta":{"origin":10421,"position":2},"title":"NIGERIA: PGS Supports Nigeria Delta Mini Bid Round","author":"","date":"January 11, 2023","format":false,"excerpt":"The Nigerian Upstream Petroleum Regulatory Commission (NUPRC) have scheduled a pre-bid conference on 16 January 2023, after which interested companies will be invited to submit their pre-qualification applications by 31 Jan 2023. Seven blocks are on offer, focused in the north-western Nigerian Offshore. Blocks PPL-300-DO, PPL-301-DO and PPL-302-DO are located\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Nigeria-PGS-megasurvey-2.png?fit=937%2C529&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Nigeria-PGS-megasurvey-2.png?fit=937%2C529&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Nigeria-PGS-megasurvey-2.png?fit=937%2C529&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/01\/Nigeria-PGS-megasurvey-2.png?fit=937%2C529&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10261,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-pgs-completes-data-imaging-of-the-kwanza-shelf-and-releases-final-products\/","url_meta":{"origin":10421,"position":3},"title":"ANGOLA: PGS Completes Data Imaging of the Kwanza Shelf and Releases Final Products","author":"","date":"April 26, 2021","format":false,"excerpt":"Final depth-imaged data, now ready for viewing, covers Angola 2021 offshore licensing opportunities. Eight thousand three hundred square kilometers (8 300 sq. km) of GeoStreamer data is available for Blocks 6, 7 and 8 and the surrounding areas of the Kwanza Shelf. Depth Migrated Data & Final Products Available Now\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/pgs-kwanza.jpg?fit=750%2C391&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/pgs-kwanza.jpg?fit=750%2C391&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/pgs-kwanza.jpg?fit=750%2C391&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/04\/pgs-kwanza.jpg?fit=750%2C391&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12696,"url":"https:\/\/www.oilnewskenya.com\/index.php\/congo-brazaville-pgs-extends-blocks-marine-xix-and-marine-xxx-vision-coverage\/","url_meta":{"origin":10421,"position":4},"title":"CONGO BRAZAVILLE: PGS Extends Blocks Marine XIX and Marine XXX Vision Coverage","author":"","date":"September 29, 2022","format":false,"excerpt":"The latest extension of the PGS Congo Vision dataset will increase regional coverage by nearly 50%. Phase four reprocessing has begun and the final fully reprocessed volume will be available in Q2 2023. The Congo Vision dataset provides a seamless 3D KPSDM seismic volume across the shelf and deepwater areas\u2026","rel":"","context":"In &quot;Central Africa&quot;","block_context":{"text":"Central Africa","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/central-africa\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/congo-vision-phase-43.jpg?fit=860%2C484&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/congo-vision-phase-43.jpg?fit=860%2C484&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/congo-vision-phase-43.jpg?fit=860%2C484&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2022\/09\/congo-vision-phase-43.jpg?fit=860%2C484&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":13599,"url":"https:\/\/www.oilnewskenya.com\/index.php\/angola-pgs-releases-central-basin-time-data\/","url_meta":{"origin":10421,"position":5},"title":"ANGOLA: PGS Releases Central Basin Time Data","author":"","date":"April 23, 2023","format":false,"excerpt":"PGS has released a new Angola Central Basin Time screening dataset, offering the opportunity to evaluate open acreage for proven pre- and post-salt plays in readiness for the 2025 licensing round. Recent legislative changes now incentivize gas and marginal field developments, providing further reasons to evaluate this underexplored region. This\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Angola-Central-basin.png?fit=1114%2C658&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Angola-Central-basin.png?fit=1114%2C658&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Angola-Central-basin.png?fit=1114%2C658&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Angola-Central-basin.png?fit=1114%2C658&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2023\/04\/Angola-Central-basin.png?fit=1114%2C658&ssl=1&resize=1050%2C600 3x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=10421"}],"version-history":[{"count":2,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10421\/revisions"}],"predecessor-version":[{"id":10424,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10421\/revisions\/10424"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=10421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=10421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=10421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}