{"id":10381,"date":"2021-05-30T16:47:58","date_gmt":"2021-05-30T16:47:58","guid":{"rendered":"https:\/\/www.oilnewskenya.com\/?p=10381"},"modified":"2021-05-30T18:53:57","modified_gmt":"2021-05-30T18:53:57","slug":"nigeria-oza-1-well-re-entry-on-coursewith-the-supporting-infrastructure-installed-operational","status":"publish","type":"post","link":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-oza-1-well-re-entry-on-coursewith-the-supporting-infrastructure-installed-operational\/","title":{"rendered":"NIGERIA: Oza-1 well Re-entry On-coursewith the Supporting Infrastructure Installed &#038; Operational"},"content":{"rendered":"<p>Decklar has said it continues to make considerable progress on the Oza-1 well re-entry with the camp and all associated infrastructure fully installed and operational. The major components of the drilling rig equipment are being transported to the field this week and it is anticipated the rig will be completely moved, installed and rigged-up within two weeks.<\/p>\n<p>Decklar will then commence the Oza-1 well re-entry operational activities including the initial work of pulling out the existing tubing, running a cement bond log and cased hole reservoir logs. The re-entry activities will then include the testing of three oil bearing zones (L2.2, L2.4 and L2.6) independently and then it is anticipated that a final dual-tubing string completion will be installed and the L2.2 and L2.6 zones placed into production upon successful testing.<\/p>\n<p>The drilling rig is expected to then be skidded on the same drill pad as Oza-1 to a new drilling slot and a horizontal development well will be drilled in the L2.4 zone and placed on production. The Oza-1 well and new horizontal development well are anticipated to generate significant production levels and cash flow in an abbreviated time frame due to the already existing infrastructure in place.<\/p>\n<p>The Oza development is anticipated to then continue with one or two more re-entries on existing wells and additional development drilling program with a potential of eight to ten wells being drilled for the full field development. Additional early production and central processing facilities will be added as required to accommodate additional production levels from field development activities.<\/p>\n<p>The Oza Oil Field has significant export and production capacity through processing facilities and infrastructure already in place and operational, which will allow for the immediate export and sale of crude oil from the Oza-1 well.<\/p>\n<p><strong><u>The Oza Oil Field Summary<\/u><\/strong><\/p>\n<p>As previously announced, the Oza Oil Field was formerly operated by Shell Petroleum Development Company of Nigeria Ltd. \u00a0The field has three wells and one side track drilled between 1959 and 1974. During the period when Shell was the operator, there were two periods of extended production testing from the Oza-1, -2 &amp; -4 wells. The field was however never tied into an export facility, nor was it fully developed by Shell and put into commercial production.<\/p>\n<p>In 2003, the Oza Oil Field was awarded to Millenium Oil and Gas Company Limited \u00a0having won the field during the 2003 Marginal Fields Licensing Round. Since Millenium\u2019s acquisition of the Oza Oil Field, approximately US$50 million has been spent on infrastructure in support of a restart of production including an export pipeline to tie the Oza Oil Field production into the Trans Niger Pipeline (TNP) which goes to the Bonny Export Terminal, a lease automatic custody transfer (LACT) unit fiscal metering system, infield flow-lines, manifolds, and related production facilities.<\/p>\n<p>The Risk Service Agreement \u00a0that Decklar and Millenium entered provides Decklar the majority share of production and associated cash flow from the Oza Oil Field in exchange for funding and technical assistance to restart commercial production and full field development; the RSA terms include a preferential return of Decklar\u2019s costs plus a share of cash flow thereafter. In exchange, Decklar is entitled to priority recovery of its capital from 80% of distributable funds. After achieving cost recovery, Decklar\u2019s profit share is based on a sliding scale starting at 80% and declining to 40% once cumulative production exceeds 10 million bbls.<\/p>\n<p>Decklar is also pleased to announce that it continues to make good progress on evaluations and negotiations for additional proven undeveloped oil and gas fields in Nigeria that have significant reserves and near-term production potential.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Decklar has said it continues to make considerable progress on the Oza-1 well re-entry with the camp and all associated infrastructure fully installed and operational. The major components of the &hellip; <a href=\"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-oza-1-well-re-entry-on-coursewith-the-supporting-infrastructure-installed-operational\/\" class=\"more-link\">Read More<\/a><\/p>\n","protected":false},"author":24,"featured_media":10382,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[7442,11,7444],"tags":[8962,9324,8776,1749,8348,9323,9112,9325],"class_list":["post-10381","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-countries","category-top-news","category-west-africa","tag-bonny-export-terminal","tag-decklar","tag-millenium-oil-and-gas","tag-nigeria","tag-oza-oil-field","tag-oza-1-well","tag-shell-petroleum-development-company","tag-trans-niger-pipeline","entry"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p5JWkQ-2Hr","jetpack-related-posts":[{"id":10457,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-provides-oza-1-well-re-entry-update\/","url_meta":{"origin":10381,"position":0},"title":"NIGERIA: Decklar Resources Provides Oza-1 Well Re-Entry Update","author":"","date":"June 17, 2021","format":false,"excerpt":"Rig On-site at Oza-1 Preparing to Commence Operations Decklar has made significant progress in preparation for the Oza-1 well re-entry with the arrival of the drilling rig, camp, and all associated equipment at the site. The drilling rig has been installed and is in the final rigging up stage, and\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":10718,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-continues-re-entry-operations-at-the-oza-1-well-site\/","url_meta":{"origin":10381,"position":1},"title":"NIGERIA: Decklar Resources Continues Re-entry Operations at the Oza-1 Well Site","author":"","date":"August 12, 2021","format":false,"excerpt":"Re-entry operations at the Oza-1 well site continue to progress with the completion of critical initial work activities including pulling the existing tubing and the 5 \u00bd inch casing that was inside the 9 \u215d inch casing. The 9 \u215d inch casing has been scrapped and circulated clean and over\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":10604,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-to-participate-in-asaramatoru-oil-field-in-oml-11\/","url_meta":{"origin":10381,"position":2},"title":"NIGERIA: Decklar Resources to Participate in Asaramatoru Oil field in OML 11","author":"","date":"July 20, 2021","format":false,"excerpt":"Decklar Resources has announced the completion of a Share Purchase Agreement to purchase all of the issued and outstanding ordinary shares of Purion Energy Limited , a Nigerian entity that has entered into a Risk Finance and Technical Services Agreement\u00a0 with Prime Exploration and Production Limited, the Operator of the\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":11023,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-completion-operations-for-the-oza-1-well\/","url_meta":{"origin":10381,"position":3},"title":"NIGERIA: Decklar Resources Completion Operations for the Oza-1 well","author":"","date":"October 22, 2021","format":false,"excerpt":"Decklar Resources\u00a0has announced the commencement of completion operations for the\u00a0Oza-1 well re-entry. As previously announced, the Oza-1 well re-entry has been successfully flow-tested in the three target zones (L2.2, L2.4, and L2.6). The final well completion design and procurement has been concluded, with all completion equipment now having arrived on\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2021\/05\/Oza-field.jpg?fit=750%2C664&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":12241,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-decklar-resources-inc-commences-shipment-of-crude-oil-to-market-from-oza-oil-field\/","url_meta":{"origin":10381,"position":4},"title":"NIGERIA: Decklar Resources Inc. Commences Shipment of Crude Oil to Market From Oza Oil Field","author":"","date":"May 10, 2022","format":false,"excerpt":"Decklar and its co-venturer Millenium Oil & Gas Company Limited have commenced loading crude oil into trucks at the Oza Oil Field from storage tanks for delivery to the UPIL crude handling facilities for further transfer to the SPDC Joint Venture Forcados Oil Export Terminal via the Umugini Pipeline. The\u2026","rel":"","context":"In &quot;Countries&quot;","block_context":{"text":"Countries","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/countries\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":9796,"url":"https:\/\/www.oilnewskenya.com\/index.php\/nigeria-san-leon-energy-provides-update-on-investment-in-oza-field-2\/","url_meta":{"origin":10381,"position":5},"title":"NIGERIA: San Leon Energy Provides Update on Investment in Oza Field","author":"","date":"February 2, 2021","format":false,"excerpt":"San Leon has provided an update on the funding arrangements by Decklar Petroleum Limited to develop the Oza Oil Field in Nigeria.\u00a0 When fully disbursed, the funding is expected to be sufficient to re-establish oil production and provide development funding for the Oza Oil Field.\u00a0 Update Regarding Funding Arrangements \u00a0The\u2026","rel":"","context":"In &quot;Top News&quot;","block_context":{"text":"Top News","link":"https:\/\/www.oilnewskenya.com\/index.php\/category\/top-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.oilnewskenya.com\/wp-content\/uploads\/2020\/09\/Nigeria-oza_field.jpg?fit=800%2C497&ssl=1&resize=700%2C400 2x"},"classes":[]}],"jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"_links":{"self":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/comments?post=10381"}],"version-history":[{"count":1,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10381\/revisions"}],"predecessor-version":[{"id":10383,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/posts\/10381\/revisions\/10383"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media\/10382"}],"wp:attachment":[{"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/media?parent=10381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/categories?post=10381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oilnewskenya.com\/index.php\/wp-json\/wp\/v2\/tags?post=10381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}